I was able to walk the new building Wednesday and WOW! The walls are going up fast and the building is taking shape. 530 wells are being drilled down 250ft for the Geothermal system. Most of the roof is on and things are progressing well.
The 1st picture is of me standing in one of the classrooms on the north end and behind me are the front offices. The 2nd pic is from the main intersection of the building looking west to the academic wing. The 3rd pic is looking into the library from the entrance looking north which will be almost all windows. And the 4th pic is looking into the Big gym, through the weight room, and into the smaller gym on the back side.
It's looking great so far!!
Mr. Miller